CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 4 November 2016 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Nov 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. Of note this week was the Chandra Quarterly Review conducted on Nov 2 in Cambridge. The schedule of targets for the next week is shown below and includes an observation of NGC 3227 coordinated with XMM and NuSTAR. |
------------------------------------------
Radiation Belts Nov 8 Abell1795outskirts ACIS-I Perseuscoldfront2 ACIS-I Nov 9 NGC3227 ACIS-S/HETG Abell1795outskirts ACIS-I Nov 10 Radiation Belts Nov 11 Perseuscoldfront2 ACIS-I Abell1795outskirts ACIS-I BootesCy17-1 ACIS-I Nov 12 CygnusA-Nucleus ACIS-I BootesCy17-1 ACIS-I Radiation Belts Nov 13 G292.0+1.8 ACIS-I PSZ1G254.58-32.16 ACIS-S Nov 14 GALEXJ010724.7+1332 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports