Friday 20 May 2016 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on May 17 to uplink a flight software patch that updates PCAD constants which affect the gyro bias vector when the PCAD software initializes. Additional real-time procedures were executed on May 17-19 to dump OBC-A and -B memory as a follow-up to the patch. The dump will be used to update the baseline memory images maintained on the ground. The schedule of targets for the next week is shown below and includes observations of IGR J17091-3624, which are follow-ups to a Target of Opportunity accepted Mar 25, an observation of MAXI J0556-332, which was accepted as a Target of Opportunity on May 3, an observation of IGR J17091-3624 coordinated with NuSTAR, and an observation of Jupiter coordinated with HST. |
------------------------------------------
Radiation Belts May 23 1E161348-5055 ACIS-I NYLupi ACIS-S/HETG PSZ2G254.46-14.44 ACIS-I May 24 Jupiter HRC-I NYLupi ACIS-S/HETG Radiation Belts May 25 NYLupi ACIS-S/HETG RXCJ0439.2-4600 ACIS-I May 26 RXCJ0018.9-4051 ACIS-I IGRJ17091-3624 ACIS-S/HETG fcc43 ACIS-S May 27 IC2006 ACIS-S MAXIJ0556-332 ACIS-S IGRJ17091-3624 ACIS-S/HETG Radiation Belts May 28 NYLupi ACIS-S/HETG fcc301 ACIS-S M87 ACIS-S 2MASXJ16560158+2112 ACIS-S May 29 Cl1813-178 ACIS-I 1E161348-5055 ACIS-I May 30
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports