News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 6 November 2015 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Nov 5 perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes observations of V5668 Sgr and ASASSN-15lh, which were accepted as a Targets of Opportunity on Oct 5 and 19 respectively, and an observation of SDSS J1724+3135 coordinated with ground-based observatories.



------------------------------------------
        Radiation Belts                     Nov  9
        DragonfishAssociati    ACIS-I
        NGC3773                ACIS-S       Nov 10
        G296.5+10.0-SE         ACIS-I
        30Doradus              ACIS-I
        NGC1232                ACIS-I
        RXJ0420.0-5022         ACIS-S       Nov 11
        Radiation Belts
        ASASSN-15lh            ACIS-S       Nov 12
        DragonfishAssociati    ACIS-I
        V5668Sgr               HRC-S/LETG
        PSS0133+0400           ACIS-S       Nov 13
        HAT-P-11               ACIS-S       Nov 14
        LP347-5                ACIS-S
        Radiation Belts
        Abell1367              ACIS-I
        SDSSJ1724+3135         ACIS-S       Nov 15
        ZwCl2341.1+0000        ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports