News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 22 May 2015 9.00am EDT

During the last week the observing schedule was replanned to incorporate an observation of MXB1730-335, which was accepted as a Target of Opportunity on May 21. Scheduled observations of Swift J145440.2-5135 and NGC 5033 were impacted by the replan and will be rescheduled in future weeks.

A real-time procedure was executed on May 19 to uplink a flight software patch that updates PCAD constants which affect the gyro bias vector when the PCAD software initializes. Additional real-time procedures were executed on May 19 to dump OBC-A memory as a follow-up to the patch. The dump will be used to update the baseline memory image maintained on the ground.

The schedule of targets for the next week is shown below and includes M28 coordinated with NRAO-GBT.



------------------------------------------
        ChandraDeepField-S     ACIS-I       May 25
        M31bulge               ACIS-I       May 26
        Radiation Belts
        30Doradus              ACIS-I       May 27
        Abell1882-Filament     ACIS-I
        NGC5713                ACIS-I       May 28
        Radiation Belts                     May 29
        30Doradus              ACIS-I
        M28                    ACIS-S       May 30
        RMJ160319.0+031644.    ACIS-I
        AbellS753              ACIS-I
        Radiation Belts                     May 3

------------------------------------------

All spacecraft subsystems continued to support nominal operations.