Friday 17 October 2014 9.00am EDT
During the last week the observing schedule was replanned to incorporate an observation of NuSTAR J164222-4642.9, which was accepted as a Target of Opportunity on Oct 13 and to update the target coordinates of two of the Comet C/2013 A1 Siding Spring/Mars encounter observations. A planned observation of SDSS J163718.64+274026.5 was impacted by the replan and will be rescheduled in a future week. A real-time procedure was executed on Oct 15 to perform a diagnostic dump of the Control Processing Electronics (CPE). Of note this week was the Chandra Quarterly Review conducted on Oct 15 in Cambridge. The schedule of targets for the next two weeks is shown below and includes observations of GRB 140930B and NuSTAR J164222-4642.9, which were accepted as Targets of Opportunity on Oct 1 and 13 respectively |
------------------------------------------
C2013A1SIDINGS (2 obs) ACIS-S Oct 19 MARS (2 obs) ACIS-I NuSTARJ164222-4642. ACIS-S Oct 20 SgrA* ACIS-S NGC1404 ACIS-S Radiation Belts Oct 21 RYTau ACIS-S/HETG Oct 22 NGC1404 ACIS-S Oct 23 GRB140930B ACIS-S RYTau ACIS-S/HETG Radiation Belts Oct 24 ChandraDeepField-S ACIS-I IGRJ17062-6143 ACIS-S/HETG Oct 25 30Doradus ACIS-I ChandraDeepField-S ACIS-I Oct 26 Radiation Belts IGRJ17062-6143 ACIS-S/HETG Oct 27 30Doradus ACIS-I Oct 28 ChandraDeepField-S ACIS-I Radiation Belts Oct 29 NGC1404tail ACIS-S Oct 30 3C237 ACIS-S Oct 31 ChandraDeepField-S ACIS-I Radiation Belts Nov 1 30Doradus ACIS-I NGC1404 ACIS-S Nov 2 ChandraDeepField-S ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports