Operations CXO Status Report

Friday 22 August 2014 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Chandra passed through the fourteenth, fifteenth and sixteenth (and final) eclipses of the season on Aug 16, 19 and 21 respectively, with nominal power and thermal performance. Real-time procedures were executed on Aug 22 to disable SCS-29 and to dump and clear the EPS glitch counters as post-eclipse season actions.

The schedule of targets for the next week is shown below and includes an observation of SGR 1935+2154, which was accepted as a Director's Discretionary Time TOO on Aug 7, and an observation of NGC 3256 coordinated with NuSTAR.



------------------------------------------
        SerpensX-1             ACIS-S/HETG  Aug 25
        Radiation Belts                     Aug 27
        ESO153-G003            ACIS-S
        NGC3256                ACIS-S
        IGRJ11014-6103         ACIS-I       Aug 28
        SDSSJ134640.79+5228    ACIS-S       Aug 29
        Radiation Belts
        SgrA*                  ACIS-S       Aug 30
        Antares                HRC-I
        RXJ1416.4+2315Offse    ACIS-I
        SGR1935+2154           ACIS-S       Aug 31
        RXJ085451.0+621843     ACIS-I
        SDSSJ232328.01+1405    ACIS-S
        MACSJ0416.1-2403       ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.