During the last week Chandra completed the observing schedule as planned. Chandra passed through the fourteenth, fifteenth and sixteenth (and final) eclipses of the season on Aug 16, 19 and 21 respectively, with nominal power and thermal performance. Real-time procedures were executed on Aug 22 to disable SCS-29 and to dump and clear the EPS glitch counters as post-eclipse season actions. The schedule of targets for the next week is shown below and includes an observation of SGR 1935+2154, which was accepted as a Director's Discretionary Time TOO on Aug 7, and an observation of NGC 3256 coordinated with NuSTAR. |
------------------------------------------
SerpensX-1 ACIS-S/HETG Aug 25 Radiation Belts Aug 27 ESO153-G003 ACIS-S NGC3256 ACIS-S IGRJ11014-6103 ACIS-I Aug 28 SDSSJ134640.79+5228 ACIS-S Aug 29 Radiation Belts SgrA* ACIS-S Aug 30 Antares HRC-I RXJ1416.4+2315Offse ACIS-I SGR1935+2154 ACIS-S Aug 31 RXJ085451.0+621843 ACIS-I SDSSJ232328.01+1405 ACIS-S MACSJ0416.1-2403 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports