Friday 8 August 2014 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Aug 6 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. Chandra passed through the ninth and tenth eclipses of the season on Aug 3 and 6 respectively, with nominal power and thermal performance. The schedule of targets for the next week is shown below and includes an observation of the Crab coordinated with HST. |
------------------------------------------
Radiation Belts Aug 11 ACT-CLJ0022-0036 ACIS-I NGC289 ACIS-I Aug 12 AbellS0295 ACIS-I Aug 13 3C154 ACIS-S Radiation Belts G115.71+17.52 ACIS-I Aug 14 Abell2256 ACIS-I NGC3359 ACIS-I Aug 15 3C169.1 ACIS-S Aug 16 Crab ACIS-S 3C142.1 ACIS-S Radiation Belts GX3+1 ACIS-S/HETG Aug 17 Abell2256 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.