CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 15 April 2005 8.30am EDT
During the last week Chandra completed the observing schedule as planned.
Real time procedures were completed on Apr 8 to disable SCS 29 as a clean-up action to the SCS 107 run on Apr 5, and on Apr 13 to perform a routine diagnostic dump of the CPE. The schedule of targets for the next week is shown below and includes an observation of SGR 1806-20 accepted as a Target of Opportunity. |
------------------------------------------
PKS 1421-490 ACIS-S Apr 18 1WGA J1713.4-3949 ACIS-I Terzan 1 ACIS-S Radiation Belts Apr 19 MACS1311.0-0311 ACIS-I AX J1040.3+2045 ACIS-S Apr 20 NGC 6388 ACIS-S 2PIGGz0.061 J0011 ACIS-I Apr 21 RCW103 ACIS-I SDSSJ123215.81+020 ACIS-S Radiation Belts M87 ACIS-S Apr 22 SGR 1806-20 HRC-S 4U 1700+24 HRC-I W3(OH) ACIS-I ESO 351-021 ACIS-S Apr 23
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports