News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 1 April 2005 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Of note this week was the completion of a 2 day safemode recovery training simulation held during 28-29 March. The operations team efficiently identified the cause of the simulated safemode and completed a nominal recovery to normal operations mode.

The schedule of targets for the next week is shown below.

------------------------------------------
SDSS J101018.19+00     ACIS-S       Apr 3
Crab Nebula (3 obs)    ACIS-S/HETG  Apr 4
V710 Tau               ACIS-S
Maffei 1               ACIS-S
cl0333-2456            ACIS-I       Apr 5
MACSJ2219.1-1844       ACIS-I
Radiation Belts
EGS-4                  ACIS-I       Apr 6
Abell 1569             ACIS-I       Apr 7
EGS-4                  ACIS-I
cl1312+3900            ACIS-I       Apr 8
Radiation Belts
G299.2-2.9             ACIS-S       Apr 9
2MASS 031159-46554     ACIS-S
HD 204867              HRC-I
MACSJ1542.0-2915       ACIS-I       Apr 10
PSR J1537+1155         ACIS-S
AX J1426.9+2334        ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports