News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 9 November 2012 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Nov 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

A Chandra image release was issued on Nov 7 describing observations of Cygnus OB2, a star cluster in the Milky Way that contains many hot, massive young stars. A deep Chandra observation of Cygnus OB2 has found almost 1,500 stars emitting X-rays. For details see: http://chandra.si.edu/photo/2012/cygob2/

The schedule of targets for the next week is shown below and includes an observation of UZTauE_P3 coordinated with OVRO/CARMA and an observation of NGC 253 coordinated with the VLBA.



------------------------------------------
Radiation Belts                     Nov 12
         PLCKG266.6-27.3        ACIS-I
         IC3418                 ACIS-S
         G12-36                 ACIS-I
         G12-14                 ACIS-I       Nov 13
         UZTauE_P3              ACIS-S
         Haro9                  ACIS-S
         SDSSJ132231.86+2631    ACIS-S
         NGC6717                ACIS-S       Nov 14
         Radiation Belts
         Abell115               ACIS-I
         NGC253                 ACIS-I       Nov 16
         Abell115               ACIS-I
         IGRJ18490-0000         ACIS-S
         HD107148               ACIS-S
         Radiation Belts                     Nov 17
         PLCKG266.6-27.3        ACIS-I
         SPT-CLJ2148-6116       ACIS-I
         G12-63                 ACIS-I       Nov 18
         Z5699                  ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports