News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 25 February 2005 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Of note this week was a successful ground system interface test with the JPL DSN test facility, DTF-21. The test was was conducted as part of the OCC ground system linux migration test program.

The schedule of targets for the next week is shown below and includes an observation of the LkHa101 Cluster coordinated with the VLA.

------------------------------------------
Radiation Belts                     Feb 28
3EG J1835+5918         HRC-S     
2QZ J114221-01481      ACIS-S       Feb 29
SDSS J125055.28-01     ACIS-S     
SDS 1321+0038          ACIS-S     
MKW8                   ACIS-I     
SDSS J1408+0205        ACIS-S     
NGC4760                ACIS-I       Mar 2
6C 0905+3955           ACIS-S     
The Crab Nebula        ACIS-S/HETG
Radiation Belts
PSR J0437-4715         ACIS-S       Mar 3 
M87                    ACIS-I     
M87                    ACIS-I     
Radiation Belts
RCS1107.3-0523         ACIS-S       Mar 5
LkHa101 Cluster        ACIS-I       Mar 6

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports