News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 23 March 2012 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Chandra passed through the second and third eclipses of the season on Mar 18 and 21 respectively, with nominal power and thermal performance.

The schedule of targets for the next week is shown below and includes an observation of SN 2012A, which was accepted as a Target of Opportunity on Mar 7.



------------------------------------------
A1795 (5 obs)          ACIS-I       Mar 25
         SDSSJ1225+2235         ACIS-S       Mar 26
         SDSSJ1153+2151         ACIS-S
         SDSSJ1148+2313         ACIS-S
         SDSSJ1034+1912         ACIS-S
         NGC3588                ACIS-S
         Radiation Belts                     Mar 27
         1FGLJ1311.7-3429       ACIS-I
         Comacluster            ACIS-I
         PSRJ1333-4449          ACIS-S       Mar 28
         SNR1987A               ACIS-S/HETG
         Radiation Belts                     Mar 29
         J0132.0-4156           ACIS-I
         CIZAJ2242.8+5301       ACIS-I
         Vega                   HRC-S        Mar 31
         SDSSJ135646.11+1026    ACIS-S
         Radiation Belts                     Apr  1
         SNR1987A               ACIS-S/HETG
         Abell3560              ACIS-S
         SN2012A                ACIS-S       Apr  2
         SDSSJ1027+3543         ACIS-S
         Vega                   HRC-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports