Friday 19 November 2004 9.00am EST
During the last week Chandra completed the observing schedule as
planned.
Last week the science observing program was resumed at 10:15pm on Nov 12 following a week-long interruption due to high solar activity. A total of 311 ks of science time was lost due to the activity and the affected targets will be rescheduled in later loads. A real-time procedure was completed on Nov 13 to re-enable SCS 99. The action was required following the recovery from Normal Sun Mode on Nov 12. The schedule of targets is shown below and includes two observations of PKS2155-304 coordinated with XMM Newton. |
------------------------------------------
HH111 ACIS-S Nov 21 RX J0806.3+1527 ACIS-S HR 1940 ACIS-I Radiation Belts Nov 22 PKS2155-304 HRC-S/LETG Orion Nebula Cluster ACIS-S/HETG PKS2155-304 ACIS-S/HETG Nov 23 HD 130948 BC ACIS-S Nov 24 Radiation Belts ArLac (21 obs) HRC-I Nov 25 M31-0046.0+4143 ACIS-S Her X-1 ACIS-S/HETG Nov 26 M31-0046.0+4143 ACIS-S M87 ACIS-S PKS 1202-262 ACIS-S HD 130948 BC ACIS-S Nov 27 Radiation Belts ArLac (21 obs) HRC-S Nov 28
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports