News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 5 December 2008 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A test was completed on Dec 1 to measure the cooling effects on the ACIS focal plane of turning off the Science Instrument Module (SIM) FA6 heater. Turning off the FA6 heater is expected to create additional margin in control of the ACIS focal plane temperature following a similar step taken in April when the ACIS detector housing heater was turned off.

A real-time procedure was executed on Dec 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

Of note this week was the conduct of the cycle 10 EPO peer review held at the CXC.

The schedule of targets for the next week is shown below and includes an observation of Eta Carina coordinated with Suzaku.

------------------------------------------
0256+075               ACIS-S       Dec  7
4U1957+11 (3 obs)      ACIS-S/HETG
0415+379               ACIS-S       Dec  8
1RXSJ040913.8+110833   ACIS-S
NGC1204                ACIS-I
Eta Car                ACIS-S/HETG
SN1996cr               ACIS-S/HETG
RCS1615+3055           ACIS-S
SDSSJ081618.99+4823    ACIS-S       Dec  9
Radiation Belts
Eta Car                ACIS-S/HETG  Dec 10
1RXSJ200924.1-853911   ACIS-S
SDSSJ1606+2900         ACIS-S
4C60.07                ACIS-I
PNHFG1                 ACIS-S       Dec 11
SDSSJ0815+3959         ACIS-S       Dec 12
Radiation Belts
Eta Car                ACIS-S/HETG
G305                   ACIS-I       Dec 13
ESO270-G007            ACIS-I       Dec 14
RCS1447+0828           ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports