CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 30 May 2008 8.30am EDT
During the last week Chandra completed the observing schedule as
planned.
An Operations Control Center ground system software update was installed on May 29 to provide more complete access to DSN station data. The change was made in connection with an update to the ground system telemetry data base. The schedule of targets for the next week is shown below and includes an observation of SGR 1627-41 that was accepted as a target of opportunity on May 28. The observation will be coordinated with RXTE. |
------------------------------------------
Radiation Belts Jun 3 NGC 6611 ACIS-I XTE J1701-462 ACIS-S SGR 1627-41 ACIS-S Jun 4 AEGIS-1 ACIS-I 3C460 ACIS-S Jun 5 SN 2005db ACIS-S NGC 6611 ACIS-I Radiation Belts AEGIS-1 ACIS-I Jun 6 NGC5813 ACIS-S AEGIS-1 ACIS-I Jun 7 Radiation Belts Jun 8 NGC 6611 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports