News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 21 December 2001 9.00am EST

During the last week, Chandra completed the observing schedule as planned.

A realtime procedure was completed on 17 Dec to swap from SSR-B to SSR-A. SSR-A had become full following a series of missed DSN passes caused by technical problems at the sites. Recording automatically switched to SSR-B to avoid data loss. All the data from both recorders were recovered at the next and subsequent passes however, thus maintaining the mission record of no data loss due to over-filled recorders.

A Chandra press release was issued on 19 Dec describing the "aftermath of a titanic explosion" in the elliptical galaxy NGC 4636. For further details and images showing the 25,000 light year symmetric arcs resulting from the explosion, see: http://chandra.harvard.edu/press/01_releases/press_121901.html.

The mission planning team completed work on the 2-week schedule to span the holiday period. The schedule of observations is shown below and includes a series of grating observations of Comet Linear, and an observation of Alpha Tauri coordinated with the Hubble Space Telescope.

------------------------------------------
Q1245-197               ACIS-S       Dec 23
PSS0957+3308            ACIS-S
CHVC125                 ACIS-S
A2294                   ACIS-I       Dec 24
Cygnus Loop NE2         ACIS-S
Radiation Belts                      Dec 25
Beta Ceti               HRC-S/LETG
G78.2+2.1               ACIS-I       Dec 26
CYG X-1                 ACIS-S/HETG  Dec 27
A168                    ACIS-I
Radiation Belts
HD 37022                ACIS-S/HETG  Dec 28
Alpha Tauri             HRC-I
SDSS020651+121624       ACIS-S       Dec 29
Vela PWN                ACIS-S
NGC 4038/NGC 4039       ACIS-S
Radiation Belts                      Dec 30
Comet Linear (4 obs)    ACIS-S/LETG  Dec 31
PSS0134+3307            ACIS-S
NGC 4051                HRC-S/LETG
HZ43 (3 obs)            HRC-S/LETG   Jan 1
Radiation Belts                      Jan 2
VW CEP                  HRC-S/LETG
TXS 0145+386            ACIS-I       Jan 3
Radiation Belts                      Jan 4
A168                    ACIS-I       Jan 5
1E1207.4-5209           ACIS-S
1RXSJ161411.3-630657    ACIS-I       Jan 6
HD123445                ACIS-I
Q1328+254               ACIS-S
PSS 1539+4312           ACIS-S
RX J1605+3249           ACIS-I

------------------------------------------

All spacecraft subsystems continued to operate nominally.

The next report is planned for January 4 following the holiday. A Happy Holiday and New Year to everyone from the entire Chandra Team!

Return to Status Reports