CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 19 October 2001 12.00pm EDT
During the last week, Chandra completed the observing schedule as planned.
A real-time procedure was completed on Oct 16 that verified the CPE warm start count has remained unchanged at 1 since Mar 2. A second procedure was completed on Oct 18 to dump and verify values of the gyroscope scale factors and related variables. The dump and verification was done in preparation for an update to the scale factors. The schedule of observations for the coming week is shown below. |
------------------------------------------
PSS 0902+1640 ACIS-S Oct 21 PSR B0833-45 HRC-I Radiation Belts Oct 22 1RXS J1708-4009 HRC-I Oct 23 NGC 7130 ACIS-S PSR1813-36 ACIS-S SAX J1806.5-2215 ACIS-S Oct 24 IRAS 17208-0014 ACIS-S CHVC125 ACIS-S SDSS094108+594725 ACIS-S Oct 25 Radiation Belts MG J0414+0534 ACIS-S HS0218+3707 ACIS-S Oct 26 PSS0134+3307 ACIS-S 2MASSJ222202+1952 ACIS-I M17 ACIS-I SAX J1747.0-2853 ACIS-S/HETG SN1998BW ACIS-S Oct 27
------------------------------------------
All spacecraft subsystems continued to operate nominally.
Return to Status Reports