News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 25 May 2001 11.00am EDT

During the last week, Chandra completed the observing schedule as planned.

A real-time procedure was conducted on 22 May to collect raw-mode data from the ACIS S0 chip without running in squeegee mode. The procedure was run as part of an investigation into using pre-cursor events to mitigate CTI degradation on-orbit. A series of further related tests will be run from the daily-load over the next 2-3 months.

Of note this week was the approval for operations of a new version of the Off-Line System (OFLS) ground software. The new version (9.1B) provides a number of improvements and bug fixes including an increased optimization of the scheduling algorithm and a better calculation for Earth avoidance during slews. The new software is scheduled to begin operational use on May 29.

The planned observations for the coming week are shown below.

------------------------------------------
NGC 4258               ACIS-S        May 28 
ARP 242                ACIS-S        May 29 
NGC 4382 (M85)         ACIS-S
LBQS 1212+1445         ACIS-S
LBQS 1029-0125         ACIS-S
LBQS 1442-0011         ACIS-S        May 30 
Radiation Belts
3C281                  ACIS-S
NGC4594                ACIS-S
AGX J103244-1424       ACIS-I        May 31 
M 67                   ACIS-I
Abell 1204             ACIS-I
MACS J1149.5+2223      ACIS-I        Jun 1  
MACS J1423.8+2404      ACIS-I
2MASSJ145331+1353      ACIS-I
CI AQL                 ACIS-S
NGC266                 ACIS-S
Radiation Belt
3C 275.1               ACIS-S        Jun 2  
NGC 4365               ACIS-S
NGC 3585               ACIS-S        Jun 3  
3C 228                 ACIS-S

------------------------------------------

All spacecraft subsystems continued to operate nominally.