News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 30 January 2004 8.30am EST

During the last two weeks Chandra completed the observing schedule as planned.

Chandra passed though eclipses on Jan 23, 26 and 28 with nominal power and thermal performance. The two remaining eclipses of the 2004 winter season will occur on Jan 31 and 3 February.

A real-time procedure was completed on Jan 25 to uplink a patch to the stored command sequence (SCS) in the on-board computer used to safe the HRC in the event of high radiation or other safing actions. The patch removes the HRC mechanism commanding from the safing actions in response to the failure of the -Y shutter motor select relay. A test of the SCS function was performed immediately following the uplink of the patch and completed successfully.

The schedule of targets for the next week is shown below and includes an observation of GX 339-4 coordinated with ATCA and an observation of M81 coordinated with HST.

------------------------------------------
HIP 46283              ACIS-I        Feb 2
Betelgeuse (2 obs)     ACIS-S
Betelgeuse             HRC-I
Betelgeuse (4 obs)     HRC-S
PMN J1230-1139         ACIS-S
Radiation Belts
NGC 4013               ACIS-S        Feb 3
1ES 0927+500           HRC-I         Feb 4
LBQS 1230+1705         ACIS-S
GX 339-4               ACIS-S
Vega                   HRC-I
Vega (4 obs)           HRC-S
Vega                   ACIS-S        Feb 5
Vega                   ACIS-I
F1410-276              ACIS-S
Radiation Belt
CL0926p1242            ACIS-I
0454-672               ACIS-S        Feb 6
PMN J0235-1805         ACIS-S
DLS J0054+1244         ACIS-I        Feb 7
M81 X-9                ACIS-S
Geminga                ACIS-S
CXOU J010043.1-721     ACIS-S
Radiation Belts
Cassiopeia A           ACIS-S        Feb 8

------------------------------------------

All spacecraft subsystems continued to support nominal operations.