During the last two weeks Chandra completed the observing schedule as planned.
Chandra passed though eclipses on Jan 23, 26 and 28 with nominal power and thermal performance. The two remaining eclipses of the 2004 winter season will occur on Jan 31 and 3 February. A real-time procedure was completed on Jan 25 to uplink a patch to the stored command sequence (SCS) in the on-board computer used to safe the HRC in the event of high radiation or other safing actions. The patch removes the HRC mechanism commanding from the safing actions in response to the failure of the -Y shutter motor select relay. A test of the SCS function was performed immediately following the uplink of the patch and completed successfully. The schedule of targets for the next week is shown below and includes an observation of GX 339-4 coordinated with ATCA and an observation of M81 coordinated with HST. |
------------------------------------------
HIP 46283 ACIS-I Feb 2 Betelgeuse (2 obs) ACIS-S Betelgeuse HRC-I Betelgeuse (4 obs) HRC-S PMN J1230-1139 ACIS-S Radiation Belts NGC 4013 ACIS-S Feb 3 1ES 0927+500 HRC-I Feb 4 LBQS 1230+1705 ACIS-S GX 339-4 ACIS-S Vega HRC-I Vega (4 obs) HRC-S Vega ACIS-S Feb 5 Vega ACIS-I F1410-276 ACIS-S Radiation Belt CL0926p1242 ACIS-I 0454-672 ACIS-S Feb 6 PMN J0235-1805 ACIS-S DLS J0054+1244 ACIS-I Feb 7 M81 X-9 ACIS-S Geminga ACIS-S CXOU J010043.1-721 ACIS-S Radiation Belts Cassiopeia A ACIS-S Feb 8
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports