News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 3 November 2000 2.30pm EST

During the last week, Chandra completed the observing schedule as planned.

The Observatory passed through the lunar eclipse of Oct 27 with fully nominal performance. The eclipse was the first to be handled using solar array off-pointing to avoid a possible power bus over-voltage condition following eclipse exit. The daily load off-pointed the arrays to 75 degrees at 10.10pm EST, the eclipse began at 11.10pm with 42 minute duration, and the arrays were repointed at 11:58pm.

An upgrade to the ground system software and operating system was performed on Nov 2. Both the On Line System and Off Line systems were upgraded and the new version of ONLS was operational for a pass at 1pm EST on Nov 2 as planned. Configuration of the OFLS is proceeding today.

The planned observations for the coming week are as follows.

------------------------------------------
3C15                    ACIS-S       Nov 5  
3C31                    ACIS-S       Nov 6  
SMC X-1                 ACIS-S
GSGP4X:109              ACIS-S
NGC 1291                ACIS-S       Nov 7  
Radiation Belt
GSGP4X:114              ACIS-S       Nov 8
SMC X-1                 ACIS-S
NGC 1549                ACIS-S
SMC X-1                 ACIS-S
Vela Pulsar             ACIS-S       Nov 9  
4U2129+47               ACIS-S
NGC4111                 ACIS-S
SMC X-1                 ACIS-S
GSGP4X:091              ACIS-S
Radiation Belt                       Nov 10 
B2 2236+35              ACIS-S
SNR 1987A               ACIS-S
AU Mic                  ACIS-S/HETG  Nov 12

------------------------------------------

All spacecraft subsystems continued to operate nominally.