Friday 3 November 2000 2.30pm EST
During the last week, Chandra completed the observing schedule as planned.
The Observatory passed through the lunar eclipse of Oct 27 with fully nominal performance. The eclipse was the first to be handled using solar array off-pointing to avoid a possible power bus over-voltage condition following eclipse exit. The daily load off-pointed the arrays to 75 degrees at 10.10pm EST, the eclipse began at 11.10pm with 42 minute duration, and the arrays were repointed at 11:58pm. An upgrade to the ground system software and operating system was performed on Nov 2. Both the On Line System and Off Line systems were upgraded and the new version of ONLS was operational for a pass at 1pm EST on Nov 2 as planned. Configuration of the OFLS is proceeding today. The planned observations for the coming week are as follows. |
------------------------------------------
3C15 ACIS-S Nov 5 3C31 ACIS-S Nov 6 SMC X-1 ACIS-S GSGP4X:109 ACIS-S NGC 1291 ACIS-S Nov 7 Radiation Belt GSGP4X:114 ACIS-S Nov 8 SMC X-1 ACIS-S NGC 1549 ACIS-S SMC X-1 ACIS-S Vela Pulsar ACIS-S Nov 9 4U2129+47 ACIS-S NGC4111 ACIS-S SMC X-1 ACIS-S GSGP4X:091 ACIS-S Radiation Belt Nov 10 B2 2236+35 ACIS-S SNR 1987A ACIS-S AU Mic ACIS-S/HETG Nov 12
------------------------------------------
All spacecraft subsystems continued to operate nominally.
Return to Status Reports