News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 21 May 2004 7.30am EDT

During the last week Chandra completed the observing schedule as planned.

On May 15 a real-time procedure was run to patch the ACIS flight software. This patch will correct an occasional error in raw-mode runs in which rows of CCD pixels were dropped from output telemetry and provides a modification that will allow for the future addition of timed-exposure modes without increasing code or testing complexity. The patch load executed normally but was not left on-board when a comparison of the loaded patch list did not match the ground reference file. Subsequent analysis indicated that the reference file was an incorrect version and that the loaded patches had been correct. Process changes are being developed to avoid a re-occurrence of this problem. The patch is expected to be uplinked in the next week.

A Chandra press release was issued on May 18 as a NASA HQ Space Science update. The SSU described Chandra images of multimillion degree gas in galaxy clusters that have provided astronomers with a powerful new method to probe the mass and energy content of the universe. For details see: http://chandra.harvard.edu/photo/2004/darkenergy/

The schedule of targets for the next week is shown below and includes the completion of the long HETG observation of the active galaxy MCG-6-30-15 begun last week.

------------------------------------------
Radiation Belts                     May 23
MCG-6-30-15            ACIS-S/HETG  May 24
Radiation Belts                     May 26
MCG-6-30-15            ACIS-S/HETG
NGC 4945               ACIS-S/HETG  May 27
Radiation Belts                     May 29
NGC 4945               ACIS-S/HETG
RCrADarkCloud          ACIS-I       May 30
Sculptor Dwarf Sph     ACIS-S
LBQS 0010-0012         ACIS-S
CL0853+5759            ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.