News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Wednesday 8 December 1999 8.00am EST

During the last 48 hours, Chandra completed observations of RX J1159+5531 with ACIS-I, a long observation of the Lockman Hole with HRC-I and passed through the radiation belts with the associated ACIS CTI measurements.

Final preparations are being made for the uplink and testing on-orbit of the SI Safing software patch. The patch will ensure that in the event of a safing action by the spacecraft, the Science Instruments will be placed in a safe configuration for high radiation environments. The uplink and test is scheduled for 2pm Monday Dec 13.

During the next 48 hours Chandra will perform a series of calibration observations of Ar-Lac with HRC-I, observations of NGC 1068 with HRC-S [ACIS-S; rjb], RXJ0439.0+0715 with ACIS-I, and BAL 0256-0119, NGC 1138 and NGC 7618 with ACIS-S.

The spacecraft subsystems continued to operate nominally.





Return to Status Reports