Friday 16 April 2004 9.30am EDT
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was completed on Apr 15 to update the on-board ephemeris. The schedule of targets for the next week is shown below and includes a Director’s Discretionary Time observation of the Gamma Ray Burst source GRB031203. |
------------------------------------------
GRB031203 ACIS-S Apr 18 Cassiopeia A ACIS-S Radiation Belts Apr 19 LMC X-3 ACIS-S/LETG Cassiopeia A ACIS-S Apr 20 Radiation Belts Apr 22 Cassiopeia A ACIS-S Radiation Belts Apr 24 Cassiopeia A ACIS-S Apr 25 Sculptor Dwarf ACIS-S Apr 26
------------------------------------------
All spacecraft subsystems continued to support nominal operations.