Friday 28 March 2008 7.00am EDT
During the last week Chandra completed the observing schedule as
planned.
As noted last week, the Chandra Cycle 10 proposal deadline was March 20. The initial count shows that 640 GO proposals were received in addition to 63 GTO proposals, comparable with Cycle 9. The total requested time over-subscription factor for the Cycle is approximately six. The schedule of targets for the next week is shown below and includes an observation of M87 coordinated with HST and an observation of HR 5110 coordinated with both the VLA and the VLBA. |
------------------------------------------
AEGIS-1 ACIS-I Apr 1 NGC 3627 ACIS-S NGC 4393 ACIS-S Apr 2 Vega HRC-I Vega (3 obs) HRC-S 3C33.1 ACIS-S GM AUR ACIS-S M87 ACIS-S 1045-188 ACIS-S AEGIS-1 ACIS-I Radiation Belts Apr 3 AEGIS-1 ACIS-I DDO 154 ACIS-S Apr 4 SDSS J141334.38+42 ACIS-S HR 5110 ACIS-S/HETG SDSS J102258.41+12 ACIS-S Apr 5 NGC 1851 ACIS-S Radiation Belts AEGIS-1 ACIS-I Apr 6 3CRR 318 ACIS-S 130456.95+395529.7 ACIS-S S16 ACIS-S HR 5110 ACIS-S/HETG
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports