CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 29 February 2008 7.00am EST
During the last week Chandra completed the observing schedule as
planned.
Of note this week was the approval by the Flight Director Board to turn off the ACIS detector housing heater during all perigee passages. The decision follows a series of cooling tests that indicate that the turn-off will reduce the thermal load on ACIS focal plane due to the overall increasing heating trends of the Observatory and relieve mission planning constraints. The schedule of targets for the next week is shown below. |
------------------------------------------
H1743-322 ACIS-S Mar 2 Abell 2220 ACIS-S Mar 3 NGC4151 HRC-I SST24 J142645.71+3 ACIS-S HESS J1841-053-NE ACIS-I Mar 4 Pal 10 ACIS-S 3CRR 470 ACIS-S RXCJ0237.4-2630 ACIS-I Radiation Belts Abell 2220 ACIS-S Mar 5 NGC 4625 ACIS-S NGC2563-P10 ACIS-I Mar 6 3CRR 68.2 ACIS-S UGC 4203 ACIS-S Mar 7 NGC3621 ACIS-S Radiation Belts Carina South Pilla ACIS-I Mar 8 NGC 5044 ACIS-S H 1743-322 ACIS-S Mar 9 SDSS J1419+0606 ACIS-S S23 ACIS-S 1334-127 ACIS-S HESS J1841-053-SW ACIS-I Mar 10
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports