Happy New Year from the Chandra team.
During the last two weeks Chandra completed the observing schedule as planned. Chandra passed through the six eclipses of the 2007/2008 Winter season between Dec 21 and Jan 3 with nominal power and thermal performance. The spacecraft was configured in the medium eclipse mode for all the eclipses. Following the final eclipse on Jan 3, a real-time procedure was completed on Jan 4 to disable SCS 29. A real-time procedure was completed on Dec 21 to dump OBC-A memory as a follow-up to the Radmon K-constant patch that was uploaded on Dec 18 in support of the EPHIN detector G high voltage turn-off. The dump will be used to update the baseline memory image maintained on the ground. The schedule of targets for the next week is shown below. |
------------------------------------------
Vega HRC-I Jan 7 Vega (4 obs) HRC-S 3CRR 437 ACIS-S IGR J15529-5029 ACIS-I Jan 8 J1606+0000 4C+00.5 ACIS-S RXCJ1524.2-3154 ACIS-S 3CRR 208 ACIS-S Procyon HRC-I OB1A-1200 ACIS-S Jan 9 OB1A-1630 ACIS-S 3C436 ACIS-S Radiation Belts SNR 1987A ACIS-S Jan 10 A520_OFF4 ACIS-I J0516+2458 ACIS-S Jan 11 3C135 ACIS-S SNR 1987A ACIS-S Radiation Belts Jan 12 A520_OFF2 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports