CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 7 December 2007 9.00am EST
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on Dec 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below and includes observations of NCG 1023 coordinated with HST and AEGIS coordinated with Spitzer. |
------------------------------------------
Draco ACIS-S Dec 9 3C332 ACIS-S 3C315 ACIS-S Dec 10 SDSS J133701.39-02 ACIS-S Radiation Belts AEGIS-1 ACIS-I 3C 186 ACIS-S Dec 11 NGC2563-P2 ACIS-I SDSS J074610.50+23 ACIS-S Dec 12 NGC1023 ACIS-S Radiation Belts AEGIS-1 ACIS-I Dec 13 074345.47+480813.5 ACIS-S NGC2563-P5 ACIS-I Dec 14 V1118 Ori ACIS-S SN 2006gy ACIS-S Draco ACIS-S Dec 15 Radiation Belts AEGIS-1 ACIS-I Dec 16 3C197.1 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports