News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 9 November 2007 7.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Nov 8 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes an observation of M31 coordinated with XMM-Newton.

------------------------------------------
Radiation Belts                     Nov 11
HS 1700+643            ACIS-I
SST24 J142538.22+3     ACIS-S       Nov 12
538                    ACIS-S
RXJ0439-0520           ACIS-I
IC 443 Northeast F     ACIS-I
NGC 4411               ACIS-S       Nov 13
2019                   ACIS-S
1779                   ACIS-S
cl1533+3108            ACIS-I
HS 1700+643            ACIS-I
Radiation Belts
HS 1700+643            ACIS-I       Nov 14
cl1206-0744            ACIS-I
RXJ0439-0520           ACIS-I       Nov 15
Orion Trapezium Cl     ACIS-S/HETG
HCG 31                 ACIS-S
0529+075               ACIS-S
21                     ACIS-S       Nov 16
HS 1700+643            ACIS-I
Radiation Belts
HS 1700+643            ACIS-I       Nov 17
M31                    HRC-I
cl0306-0943            ACIS-I
IC 443 East Field      ACIS-I
NGC 4299               ACIS-S       Nov 18
SST24 J142924.83+3     ACIS-S
HS 1700+643            ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports