During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jan 8 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Jan 13 NGC1300 ACIS-S SDSSJ082730.64+1921 ACIS-S PSRJ1418-6058 ACIS-I Jan 14 A1795 ACIS-I SDSSJ082730.64+1921 ACIS-S PSRJ1418-6058 ACIS-I Abell795 ACIS-S Jan 15 PSOJ170.8326+20.208 ACIS-S SDSSJ131012.35+1656 ACIS-S Radiation Belts Jan 16 NGC1300 ACIS-S Abell795 ACIS-S Abell370 ACIS-I NGC2775 ACIS-S Jan 17 SDSSJ145138.27+0903 ACIS-S NGC2775 ACIS-S SDSSJ160158.51+4705 ACIS-S HD75332 HRC-I IGRJ15550-4306 ACIS-I Jan 18 NGC4781 ACIS-S Radiation Belts Abell370 ACIS-I ZwCl0857.9+2107 ACIS-S Jan 19 Abell370 ACIS-I NGC2775 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports