CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 19 May 2006 9.00am EDT
During the last week Chandra completed the observing schedule as
planned.
A realtime procedure was completed on May 12 to update the on-board Ephemeris. The schedule of targets for next week is shown below and includes a series of observations of the coment 3P/Schwassmann-Wachmann. |
------------------------------------------
G330.2+1.0 ACIS-I May 21 XTE J1817-330 ACIS-S/HETG May 22 3P/Schwassmann (5 obs) ACIS-S May 23 1RXS J212746.7+565 ACIS-S NGC 6689 ACIS-S Radiation Belts GRB060605 ACIS-S May 24 CXOPTM J181912.4-2 ACIS-I RX J0806.3+1527 HRC-S/LETG May 25 XTE J1726-283 HRC-I M31 ACIS-I Radiation Belts May 26 AS 310 ACIS-S Q2237+0305 ACIS-S May 27 PSR B1821-24 HRC-S ELAIS-S1 C ACIS-I G284.0-0.9 ACIS-I SDSSJ1301-0058 ACIS-S May 28 SDSS J1733+5400 ACIS-S UGC 11466 ACIS-S PSR B1929+10 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports