Operations CXO Status Report

Friday 14 April 2006 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were completed on April 13 and 14 to dump the contents of checksummed memory in the on-board computer as part of the flight software recompilation project. The dumps were not successfully captured in real-time due to dropped frames within the ground segment, and a decision whether to re-dump will be made following an assessment of the solid state recorder data.

The schedule of targets for next week is shown below and includes an observation of 1E 1048.1-597 coordinated with HST.

------------------------------------------
Radiation Belts                      Apr 16
IC1262                  ACIS-I       Apr 17
NGC 1365                ACIS-S
Sh2-187                 ACIS-I
Capella                 ACIS-S/HETG
POX 52                  ACIS-S       Apr 18
A3112                   ACIS-I
Radiation Belts                      Apr 19
IC1262                  ACIS-I
NGC 1365                ACIS-S       Apr 20
XMMU J140145-61230      ACIS-S
RS Oph                  HRC-S/LETG
1E 1048.1-5937          ACIS-S
ELAIS-S1 C              ACIS-I
A3112                   ACIS-I       Apr 21
Radiation Belts
IC1262                  ACIS-I       Apr 22
A3112                   ACIS-I
NGC 1365                ACIS-S       Apr 23

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports