Operations CXO Status Report

Friday 3 June 2022 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Jun 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE).

The schedule of targets for the next week is shown below.



------------------------------------------
        Radiation Belts                     Jun  6
        ASASSN-14ko            ACIS-S
        GDH21                  ACIS-I
        GDH21                  ACIS-I       Jun  7
        GDH21                  ACIS-I
        GDH21                  ACIS-I
        GDH21                  ACIS-I
        PSRB0833-45            ACIS-S
        CMZMolecularCloud      ACIS-I       Jun  8
        HD93129A               ACIS-S
        SDSSJ130502.28+05215   ACIS-S
        Radiation Belts                     Jun  9
        KeplerSNR              ACIS-S/HETG
        JWST-DTDF-1            ACIS-I
        KeplerSNR              ACIS-S/HETG  Jun 10
        B21600+24              ACIS-S
        PKS1136-135            ACIS-S
        ASASSN-14ko            ACIS-S       Jun 11
        CMZMolecularCloud      ACIS-I
        PKS1830-211            ACIS-S
        Radiation Belts
        GX3+1                  ACIS-S/HETG
        SDSSJ010607.17+0046    ACIS-S       Jun 12
        GX3+1                  ACIS-S/HETG
        Abell2744              ACIS-I
        PLCKESZG342.31-34.90   ACIS-I

------------------------------------------

All spacecraft subsystems except HRC continued to support nominal operations.