News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 27 May 2022 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on May 25 to update PCAD Commandable Parameters to increase the automatic momentum unloading threshold in preparation for the upcoming low perigee in 2023.

Of note this week was the Chandra Quarterly Review conducted on May 26.

Also of note this week was the release of the Sherpa 4.14.1 package for Python. This release includes various documentation updates, bug fixes, and infrastructure changes. For details see: https://sherpa.readthedocs.io/en/latest/

The schedule of targets for the next week is shown below and includes an observation of Swift J095520.7+690400.9, which was accepted as a Director's Discretionary Time Target of Opportunity on May 11.



------------------------------------------
        H1413+117              ACIS-S       May 30
        4U0114+65              ACIS-S/HETG
        GDH3 (4 obs)           ACIS-I       May 31
        ASASSN-14ko            ACIS-S
        GDH3                   ACIS-I
        Radiation Belts                     Jun  1
        ASASSN-14ko            ACIS-S
        B1152+199              ACIS-S
        HD113904               ACIS-S/HETG
        GDH14                  ACIS-I       Jun  2
        GDH14                  ACIS-I
        2RXSJ004701.0+11582    ACIS-S
        GDH14                  ACIS-I
        GDH14                  ACIS-I
        GDH14                  ACIS-I
        GDHIdp42               ACIS-I
        CentaurusA             ACIS-S/HETG
        HD113904               ACIS-S/HETG  Jun  3
        Radiation Belts
        GDHIdp49 (6 obs)       ACIS-I       Jun  4
        SDSSJ012403.77+00443   ACIS-S
        SwiftJ095520.7+6904    ACIS-S
        PSZ2G101.52-29.98      ACIS-I
        GX3+1                  ACIS-S/HETG
        GDHIdp56               ACIS-I
        SDSSJ005737.71+14425   ACIS-S
        GDHIdp42               ACIS-I       Jun  5
        GX3+1                  ACIS-S/HETG
        SDSSJ010209.82+13315   ACIS-S
        GDHIdp56 (5 obs)       ACIS-I       Jun  6
        Radiation Belts

------------------------------------------

All spacecraft subsystems except HRC continued to support nominal operations.

Return to Status Reports