News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 19 November 2021 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Chandra passed through the seventh and eighth eclipses of the season on Nov 14 and 17 respectively, with nominal power and thermal performance.

Of note this week was the Chandra Quarterly Review conducted on Nov 17 by teleconference.

The schedule of targets for the next week is shown below and includes an observation of GRB210905A, which was accepted as a Director's Discretionary Time Target of Opportunity on Nov 4.



------------------------------------------
        4U1916-053             ACIS-S/HETG  Nov 22
        M33X-8                 ACIS-S/HETG
        Radiation Belts
        4U1916-053             ACIS-S/HETG  Nov 23
        WISEJ041010.60-0913    ACIS-S
        PSRJ0821-4300          HRC-S /LETG
        WISEJ041010.60-0913    ACIS-S       Nov 24
        GRB210905A             ACIS-S
        NGC2366                ACIS-S
        Radiation Belts                     Nov 25
        SDSS_J135225.80+1328   ACIS-S
        TXS0833+585            ACIS-S
        B2.40412+23            ACIS-S       Nov 26
        HZ43                   HRC-S /LETG
        IRAS09104+4109         ACIS-S
        WISEJ041010.60-0913    ACIS-S       Nov 27
        AM2303-305             ACIS-S
        PSZ2G150.90-39.05      ACIS-I
        Radiation Belts                     Nov 28
        SPT-CLJ2031-4037       ACIS-S
        WISEJ041010.60-0913    ACIS-S
        SPT-CLJ2031-4037       ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports