Friday 5 November 2021 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Nov 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Chandra passed through the first, second, and third eclipses of the season on Oct 29, Nov 1 and Nov 4 respectively, with nominal power and thermal performance. The schedule of targets for next week is shown below and includes an observation of ERO_TDE_1, which was accepted as a Director's Discretionary Time Target of Opportunity on Oct28. |
------------------------------------------
WISEAJ060841.40+422 ACIS-S Nov 8 NGC253 ACIS-I PSRJ2030+4415 ACIS-I CasA (6 times) ACIS-I ABELL262SE2 ACIS-I Radiation Belts Nov 9 SDSSJ125300.15+5248 ACIS-S CasA (4 times) ACIS-S 2RXSJ023548.1+34410 ACIS-S RXJ1053.7+5735 ACIS-S Nov 10 B2.20410+26 ACIS-S ERO_TDE_1 HRC-I B2.40401+23 ACIS-S Nov 11 RXJ1053.7+5735 ACIS-S 2RXSJ034423.4+28122 ACIS-S Radiation Belts Nov 12 DELSJ041128.63-0907 ACIS-S 4U1626-67 ACIS-S/HETG S82X-1065 ACIS-I 4U1626-67 ACIS-S/HETG Nov 13 GaiaDR271487329756 ACIS-S RXJ1053.7+5735 ACIS-S B2.10302+31 ACIS-S PSRB2224+65 ACIS-I Nov 14 Radiation Belts
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports