News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 8 October 2021 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Oct 6 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE).

Of note this week was the release of the Sherpa 4.14.0 package for Python. This release includes various enhancements, documentation updates, bug fixes and infrastructure changes. For details see: https://sherpa.readthedocs.io/en/4.14.0/

The schedule of targets for the next week is shown below and includes observations of Jupiter coordinated with Juno.



------------------------------------------
        Radiation Belts                     Oct 11
        UGC12893               ACIS-I
        Jupiter                HRC-I
        SDSSJ235609.14-0024    ACIS-S       Oct 12
        hetej1900.1-2455       ACIS-S
        ColdECSBlankSky        HRC-S
        B2.40004+21            ACIS-S
        Jupiter                HRC-I        Oct 13
        NGC253                 ACIS-I
        Radiation Belts                     Oct 14
        AntliaClusterSE        ACIS-I
        HE0230-2130            ACIS-S
        AntliaClusterSE        ACIS-I
        PS16dtm                ACIS-S       Oct 15
        AntliaClusterSE        ACIS-I
        DELSJ041128.63-0907    ACIS-S
        SDSSJ082511.60+1234    ACIS-S
        TychoSNR               ACIS-I       Oct 16
        Radiation Belts
        2MASSJ04351354+2008    ACIS-S
        Jupiter                HRC-I        Oct 17

------------------------------------------

Use of the LETG is suspended pending completion of a software patch. All other spacecraft subsystems continued to support nominal operations.

Return to Status Reports