Friday 10 September 2021 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Sep 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). An additional real-time procedure was executed on Sep 9 to perform an annual check-out of A-side MUPS thrusters, which are selected for use when Chandra is in its safe-mode configuration. Thrusters A2, A3, and A4 were fired. Thrusters performed nominally. Thruster A1 was not fired due to the expected limited life remaining on it. The schedule of targets for the next week is shown below and includes an observation of MAXI J1848-015, which was accepted as a Target of Opportunity on Aug 25 and is coordinated with NRAO VLA. |
------------------------------------------
GDH23 ACIS-I Sep 12 GDH23 ACIS-I Sep 13 GDH23 ACIS-I GDH23 ACIS-I GDH23 ACIS-I PKS0023-26 ACIS-S GDH22 ACIS-I GDH22 ACIS-I GDH22 ACIS-I MAXIJ1848-015 ACIS-S 2RXSJ222749.3-01135 ACIS-S Sep 14 MAXIJ1848-015 ACIS-S Radiation Belts Sep 15 GDH22 ACIS-I GDH22 ACIS-I Jupiter HRC-I NuSTARJ184135-0502. ACIS-S Sep 17 Radiation Belts PKS1150+497 ACIS-S Sep 18 B2.22328+26 ACIS-S NGC253 ACIS-I HD4915 HRC-S M82X-2 HRC-I Sep 19 A1351 ACIS-I NGC7000_IC5070Group ACIS-I
------------------------------------------
Use of the gratings is suspended pending a detailed review of the LETG insert anomaly. All other spacecraft subsystems continued to support nominal operations.
Return to Status Reports