Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 13 August 2021 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Aug 8 in preparation for a 48-minute-long, penumbral Lunar eclipse on Aug 9: one to activate SCS 29 and one to dump the EPS glitch counters. Chandra passed through the eclipse with nominal power and thermal performance. Real-time procedures were executed following the eclipse on Aug 9 to disable SCS29 and to dump and clear the EPS glitch counters.

The schedule of targets for the next week is shown below and includes an observation of Swift J1818.0-1607, which was accepted as a Target of Opportunity on Jul 26.



------------------------------------------
        4U1916-053             ACIS-S/HETG  Aug 15
        SNR0519-69.0           ACIS-S       Aug 16
        Radiation Belts                     Aug 17
        Collinder197           ACIS-I
        2MASXJ22140917-25574   ACIS-S
        PSRJ0821-4300          HRC-S /LETG
        SwiftJ1818.0-1607      ACIS-I       Aug 18
        AE_Aqr_s1              ACIS-S
        M51                    ACIS-S
        SS433                  ACIS-S/HETG
        M51                    ACIS-S       Aug 19
        Radiation Belts
        PSZ2G126.57+51.61      ACIS-S
        SS433                  ACIS-S/HETG  Aug 20
        PSZ2G126.57+51.61      ACIS-S
        MR2251-178             HRC-S /LETG
        2RXSJ063238.6-06315    ACIS-S       Aug 21
        NGC253                 ACIS-I
        Westerlund1            ACIS-I
        SNR0519-69.0           ACIS-S
        Radiation Belts                     Aug 22
        2RXSJ054718.0-00004    ACIS-S
        MR2251-178             HRC-S /LETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports