During the last week the observing schedule was replanned to include
an observation of GRB 051221 that was accepted as a 1 day turn-around
Target Of Opportunity (TOO) on 21 Dec. Loads were replanned and
uplinked on Dec 22. Observations of RX J0806.3+1527 and HGC 30 were
impacted by the TOO and will be rescheduled in a later load.
A brief episode of anomalous telemetry was received from the HRC instrument on Dec 15 and is under investigation. The anomalous data were seen in the secondary engineering portion of the telemetry stream and had no operational impact. No corruption of the X-ray event data was observed. Of note last week was the release of the Chandra Cycle 8 Call For Proposals on Dec 16 with a deadline for proposal submission of 15 March 2006. The Mission Planning team worked hard to develop a 2 week schedule to cover the holidays as shown below. Of note is the continuation of the long series of observations of 47 Tuc (500Ks in this schedule), and observations of M31 and M87 coordinated with HST. |
------------------------------------------
Radiation Belts Dec 26 47 Tuc HRC-S Dec 27 PG 0844+349 ACIS-S/HETG 47 Tuc HRC-S Dec 28 Radiation Belts Dec 29 47 Tuc HRC-S HDE 245059 ACIS-S/HETG Dec 30 PG 0844+349 ACIS-S/HETG 47 Tuc HRC-S Radiation Belts Dec 31 PG 0844+349 ACIS-S/HETG Jan 1 1RXS J092310.1+275 ACIS-S SDSS J0926+3624 ACIS-S 47 Tuc HRC-S Jan 2 Radiation Belts Jan 3 47 Tuc HRC-S HDE 245059 ACIS-S/HETG Jan 4 M87 ACIS-S V1118 Ori ACIS-S 47 Tuc HRC-S Jan 5 Radiation Belts Jan 6 M31 ACIS-I 47 Tuc HRC-S IRAS 20050+2720 ACIS-I Jan 7 NGC 1893 ACIS-I 47 Tuc HRC-S
------------------------------------------
The next report is planned for January 6 following the holiday. A Happy Holiday and New Year to everyone from the Chandra Team!