CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 19 March 2021 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Mar 13 to reenable the Thermal Primary Operational Bus 6 after it had been disabled on Mar 8. The data collected during this interval will allow an assessment of the thermal benefit of turning off the associated heaters and indicate whether a permanent disable is appropriate. Of note this week, the Chandra Cycle 23 proposal deadline was Mar 16 at 6pm EDT. The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Mar 21 G104.52+01.24 ACIS-I HZ43 HRC-S /LETG G104.52+01.24 ACIS-I M87Halo2 ACIS-S H1821+643 HRC-S /LETG Mar 23 M82X-2 HRC-I SDSSJ1138+0314 ACIS-S H1821+643 HRC-S /LETG Radiation Belts Mar 24 PSZ2G282.28+49.94 ACIS-I PSRJ0821-4300 HRC-S /LETG Mar 25 PKS1136-135 ACIS-S SNR1987A HRC-S /LETG PKS1136-135 ACIS-S Mar 26 H1821+643 HRC-S /LETG Radiation Belts Mar 27 JWST-DTDF-1 ACIS-I MCG-1-22-006 ACIS-S Mar 28 PKS1136-135 ACIS-S 3FGLJ1016.5-6034 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports