News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 19 February 2021 9.00am EST

During the last week the observing schedule was replanned to incorporate an observation of ASKAP J173608.2-3216, which was accepted as a Director's Discretionary Time Target of Opportunity on Feb 12. Time from scheduled observations of J114306.5+680717.8 and WISEAJ101022.95+141 was impacted by the replan and will be rescheduled in a future week.

A real-time procedure was executed on Feb 12 to uplink a flight software patch that implements an on-board ACIS Temperature Monitor. In the event that ACIS temperatures exceed predefined limits then an autonomous safing action will be run to stop the science loads and protect the instrument. Additional real-time procedures were executed on Feb 12-14 to dump OBC-A and -B memory as a follow-up to the patch. The dump will be used to update the baseline memory images maintained on the ground.

Another real-time procedure was executed on Feb 16 to temporarily raise the HRC-I microchannel plate high voltage settings during a calibration observation. The data collected will be used to update the standard high voltage settings during science observations in order to account for the expected drop in the detector gain during the mission.

The schedule of targets for the next week is shown below and includes an observation of 2020wnt, which was accepted as a Target of Opportunity on Feb 10, and an observation of WISEA J101022.95+141301.0 coordinated with VLA.



------------------------------------------
        IC750                  ACIS-S       Feb 22
        PLCKESZG342.31-34.90   ACIS-I
        IC750                  ACIS-S
        PLCKESZG342.31-34.90   ACIS-I
        Radiation Belts                     Feb 23
        HD61005                ACIS-S
        M33-South              ACIS-I       Feb 24
        WISEAJ101022.95+141    ACIS-S
        M82X-2                 HRC-I
        Mrk279                 HRC-S /LETG
        J081441.91+212918.5    ACIS-S
        J081456.10+532533.5    ACIS-S
        WISEAJ101022.95+141    ACIS-S
        HD61005                ACIS-S       Feb 25
        Mrk279                 HRC-S /LETG
        Radiation Belts                     Feb 26
        GRB190610A             ACIS-S
        J080101.41+184840.7    ACIS-S
        WISEAJ101022.95+141    ACIS-S
        DELSJ110421.59+2134    ACIS-S
        NGC6860                ACIS-S/HETG
        DELSJ110421.59+2134    ACIS-S       Feb 27
        J093922.89+370943.9    ACIS-S
        J085946.35+274534.8    ACIS-S
        2020wnt                ACIS-S
        SDSSJ100438.82+15105   ACIS-S       Feb 28
        Radiation Belts
        E0102-72.3             ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.