CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 29 January 2021 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load. The schedule of targets for the next two weeks is shown below and includes an observation of V404 Cygni coordinated with the VLA. |
------------------------------------------
RXJ0911.4+0551 ACIS-S Jan 31 H1821+643 HRC-S /LETG MKN421 ACIS-S/LETG Feb 1 2RXSJ161816.6+09305 ACIS-I IGRJ16318-4848 ACIS-S/HETG LTT3780 ACIS-S MKN421 ACIS-S/LETG Radiation Belts Feb 2 4FGLJ1358.3-6026 ACIS-I E0102-72.3 ACIS-I PGC1187281 ACIS-S H1821+643 HRC-S /LETG Feb 3 MKN421 ACIS-S/LETG H1821+643 HRC-S /LETG MKN421 ACIS-S/LETG H1821+643 HRC-S /LETG Feb 4 J162845.49+271742.7 ACIS-S MKN421 ACIS-S/LETG Radiation Belts SDSSJ134248.86+6056 ACIS-S MKN421 ACIS-S/LETG Feb 5 SDSSJ134800.13-0250 ACIS-S SN2012P ACIS-S M82X-2 HRC-I MKN421 ACIS-S/LETG IGRJ16318-4848 ACIS-S/HETG Feb 6 MKN421 ACIS-S/LETG V404Cygni ACIS-S MKN421 ACIS-S/LETG Radiation Belts Feb 7 RXJ0911.4+0551 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports