News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 21 August 2020 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A flight software patch was uplinked on Aug 14 to update the on-board gyro calibration misalignment matrix. Real-time procedures were executed on Aug 15-16 to dump OBC-A and -B memory as a follow-up to the patch. The dumps will be used to update the baseline memory images maintained on the ground.

Additional real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load.

A Chandra image release was issued on Aug 19 describing a new series of Chandra images that show pieces of Kepler's supernova remnant are moving up to 23 million miles an hour. These are extremely high speeds for an explosion that happened over 400 years ago as seen from Earth. Researchers used a Chandra spectrum and images obtained in 2000, 2004, 2006 and 2014 to measure the speeds of knots in the remnant. Kepler is a so-called Type Ia supernova, the thermonuclear explosion of a white dwarf star. For details see: https://chandra.harvard.edu/photo/2020/kepler/

The schedule of targets for the next week is shown below and includes an observation of gx5-1 coordinated with NuSTAR.



------------------------------------------
        COBRA141155.2+341510   ACIS-S       Aug 24
        Radiation Belts                     Aug 25
        JWST-DTDF-8            ACIS-I
        COBRA141155.2+341510   ACIS-S
        Abell2345              ACIS-I       Aug 26
        PSRJ1846-0258          ACIS-S
        H1821+643              ACIS-S       Aug 27
        Radiation Belts
        Abell2345              ACIS-I
        Westerlund1            ACIS-I       Aug 28
        PSRJ0821-4300          HRC-S /LETG
        SPT-CLJ2205-2956       ACIS-I
        SNR1987A               HRC-I        Aug 29
        SPT-CLJ2205-2956       ACIS-I
        PSRJ0821-4300          HRC-S /LETG
        Kapteyn'SStar          ACIS-S
        Radiation Belts                     Aug 30
        gx5-1                  ACIS-S/HETG
        H1821+643              ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports