News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 18 November 2005 8.00am EST

During the last week Chandra completed the observing schedule as planned.

Of note this week was the successful completion of the Linux migration Operations Readiness Review for the ground system. Approval was given by a combined Level 2/4 board meeting on Nov 17 to transition to operations with the Linux system at the end of November.

A Chandra image release was issued on 15 November showing a composite X-ray/optical image that reveals a cat-shaped structure produced by the remnants of two exploded stars in the Large Magellanic Cloud galaxy. For details see http://chandra.harvard.edu/photo/2005/d316/

The schedule of targets for next week is shown below and includes an observation of M87 coordinated with Hubble Space Telescope.

------------------------------------------
15 Mon                  ACIS-S/HETG  Nov 20
XLSSJ022404.0-0413      ACIS-S       Nov 21
W3 North                ACIS-I
M33 Field 6             ACIS-I
Radiation Belts
MACS1720.3+3536         ACIS-I       Nov 22
NGC 0925                ACIS-S       Nov 23
NGC 1003                ACIS-S
Betelgeuse              ACIS-I
Betelgeuse              ACIS-S
M33 Field 4             ACIS-I
IGR J00291+5934         ACIS-S       Nov 24
Radiation Belts
NGC4365                 ACIS-S       Nov 25
NGC 1012                ACIS-S
IC 0239                 ACIS-S
NGC4365                 ACIS-S
M33 Field 4             ACIS-I
X1908+375               ACIS-S/HETG  Nov 26
MACS1720.3+3536         ACIS-I
RXJ1242-1119            ACIS-S
Radiation Belts                      Nov 27
PSR J0437-4715          ACIS-S
Abell 1650              ACIS-I       Nov 28
AX J0401.4+0038         ACIS-S
M87                     ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.