News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 24 January 2020 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jan 23 to update the ACIS Flight Software. This patch will force a science run to end when it is commanded to do so by the OBC, for instance when the science loads are autonomously interrupted. The patch also includes functionality to monitor the Digital Processing Assembly component temperatures and optionally initiate safing actions if an out of limit value occurs.

The schedule of targets for the next week is shown below and includes observations of 2MASS J10422211+1641151 coordinated with NuSTAR and an observation of MWC 560 coordinated with XMM-Newton.



------------------------------------------
        HD157347               HRC-I        Jan 27
        2MASSJ10422211+1641    ACIS-S
        J092705.7+044251.9     ACIS-S
        EtaCarinae             ACIS-S/HETG
        SPT-CLJ2335-5434       ACIS-I       Jan 28
        Radiation Belts                     Jan 29
        TXS0730+504            ACIS-S
        J165844.5+351923.0     ACIS-S
        TXS0730+504            ACIS-S
        2RXSJ080855.3+32490    HRC-S /LETG  Jan 30
        MWC560                 HRC-I
        Radiation Belts                     Jan 31
        SPT-CLJ2323-5753       ACIS-I
        RMJ084114.3+075843.6   ACIS-I       Feb  1
        SPT-CLJ2323-5753       ACIS-I
        SPT-CLJ0002-5557       ACIS-I
        SDSSJ083343.47+07465   ACIS-S       Feb  2
        2MASSJ10422211+1641    ACIS-S
        Radiation Belts                     Feb  3

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports