Friday 17 January 2020 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Jan 15 to command ACIS to dump the flight software from EEPROM. The dump was compared to images maintained on the ground as a routine check. Another real-time procedure was executed on Jan 17 to patch the CPE flight software in order to correct the gyro status data. The schedule of targets for the next week is shown below and includes an observation of Eta Carinae coordinated with HST, and an observation of 4FGL J0336.0+7502 which was accepted as a Director's Discretionary Time Target of Opportunity on Dec 18. |
------------------------------------------
PROCYON HRC-I Jan 19
SPT-CLJ2336-5252 ACIS-I
MKN421 ACIS-S/LETG Jan 20
J144556.9+165308.7 ACIS-S
Radiation Belts Jan 21
F2M1324+0537 ACIS-S
MKN421 ACIS-S/LETG
MKN421 ACIS-S/LETG
SPT-CLJ2336-5252 ACIS-I
MKN421 ACIS-S/LETG Jan 22
PGC044558 ACIS-S
HD82443 ACIS-S
J123538.7+041244.8 ACIS-S Jan 23
Radiation Belts
MKN421 ACIS-S/LETG
MCG+08-33-046 ACIS-S Jan 24
MKN421 ACIS-S/LETG
SPT-CLJ2320-5233 ACIS-I
4FGLJ0336.0+7502 ACIS-S Jan 25
PSS0926+3055 ACIS-S
SDSSJ0950+0246 ACIS-S
131242.4+555554 ACIS-S
Radiation Belts Jan 26
EtaCarinae ACIS-S/HETG
J095817.5+183858.1 ACIS-S------------------------------------------
All spacecraft subsystems continued to support nominal operations.