News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 13 December 2019 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Chandra passed through the third, fourth and fifth eclipses of the season on Dec 7, 9 and 12 respectively, with nominal power and thermal performance. A real-time procedure was executed Dec 7 to clear the EPS Glitch Counter following the battery reconnection. This is a routine event possible following an eclipse.

The schedule of targets for the next week is shown below and includes observations of Ark 564 coordinated with JVLA, an observation of FRB 180916.J0158+65 which is a followup to a Director's Discretionary Time Target of Opportunity accepted on Nov 13 and is coordinated with the Effelsberg Radio Telescope, an observation of PKS 1413+13 which is a follow-up to a Director's Discretionary Time Target of Opportunity accepted on Oct 18, and observations of C/2019 Q4 Borisov which was accepted as a Director's Discretionary Time Target of Opportunity on Oct 22.



------------------------------------------
        Radiation Belts                     Dec 15
        C/2019Q4Borisov        HRC-S
        C/2019Q4Borisov        HRC-S        Dec 16
        RWAur                  ACIS-S
        C/2019Q4Borisov        HRC-S
        C/2019Q4Borisov        HRC-S
        J084219.1+300703.6     ACIS-S       Dec 17
        Radiation Belts
        RWAur                  ACIS-S
        FRB180916.J0158+65     ACIS-S
        RWAur                  ACIS-S       Dec 18
        C/2019Q4Borisov        HRC-S
        C/2019Q4Borisov        HRC-S
        RWAur                  ACIS-S
        NGC6104                ACIS-S       Dec 19
        Perseus_south_cf_1     ACIS-I
        Radiation Belts                     Dec 20
        F2M0825+4716           ACIS-S
        Ark564                 HRC-S /LETG
        PKS1413+135            ACIS-S
        Ark564                 HRC-S /LETG
        OrionNebulaCluster     ACIS-S/HETG
        CLJ211235.8-574950     ACIS-S       Dec 21
        OrionNebulaCluster     ACIS-S/HETG
        J0505                  ACIS-S       Dec 22
        OrionNebulaCluster     ACIS-S/HETG
        Radiation Belts                     Dec 23
        Perseus_south_cf_1     ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports