CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 11 October 2019 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed Oct 8 to perform a diagnostic dump of the Control Processing Electronics (CPE). An additional real-time procedure was executed Oct 9 to perform full-frame dark current readouts of the Aspect Camera Assembly CCD. The schedule of targets for the next week is shown below and includes an observation of EXO 1846-031, which is a follow-up to a Target of Opportunity which was accepted on Aug 1 and is coordinated with VLA, NICER, NUSTAR, and Gemini, and observations of AT2019pev, which was accepted as a Target of Opportunity on Oct 2. |
------------------------------------------
UVCet HRC-S /LETG Oct 13 AT2019pev HRC-S /LETG Oct 14 MRC0941-200 ACIS-S Radiation Belts Oct 15 MRC0222-234 ACIS-S AT2019pev HRC-S /LETG UVCet HRC-S /LETG Oct 16 ESO137-G034 ACIS-S SDSSJ1008+0220 ACIS-S Oct 17 Radiation Belts PSRJ1119-6127 ACIS-S Oct 18 ArLac HRC-I J104645.75+302330.9 ACIS-I GAT1370 HRC-I SDSSJ1056+3138 ACIS-S Oct 19 EXO1846-031 ACIS-S/HETG Radiation Belts Oct 20
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports