CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 4 October 2019 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed Sep 29 to perform full-frame dark current readouts of the Aspect Camera Assembly CCD. An additional real-time procedure was executed on Oct 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below and includes an observation of Mrk1018 coordinated with HST, observations of Eta Carinae coordinated with HST, and an observation of AT2019pev, which was accepted as a Target of Opportunity on Oct 2. |
------------------------------------------
Radiation Belts Oct 7 H1821+643 ACIS-S SDSSJ125448.95+4409 ACIS-S EtaCarinae ACIS-S/HETG Oct 8 XLSSC122 ACIS-I Mrk1018 ACIS-S Oct 9 Radiation Belts Oct 10 2MASXJ00253292+68214 ACIS-S EtaCarinae ACIS-S/HETG XLSSC122 ACIS-I EtaCarinae ACIS-S/HETG Oct 11 XLSSC122 ACIS-I AT2019pev ACIS-S Radiation Belts Oct 12 JWST-DTDF-7 ACIS-I UGC1479 ACIS-S Oct 13 XLSSC122 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports