Friday 28 October 2005 8.30am EDT
During the last week the observing schedule was replanned to include
an observation of GRB051022 that was approved as a fast turn-around
Target Of Opportunity (TOO) on October 22. Loads were replanned and uplinked on October 25. Observations of the targets 87GB 1437+4423 and MACSJ0159.0-3412 were impacted by the TOO and will be rescheduled in a later load.
A real-time procedure was completed on Oct 26 to update the on-board ephemeris. The Chandra Quarterly Review was conducted in Cambridge this week, and next week the CXC will host the annual Chandra Calibration Workshop (10/31-11/1), and the 6-years with Chandra conference (11/2-11/4). The schedule of targets for next week is shown below. |
------------------------------------------
beta Cep HRC-S/LETG Oct 30 M33 Field 6 ACIS-I Oct 31 beta Cep HRC-S/LETG Radiation Belts RXC J1320.2+3308 ACIS-S Nov 1 Bootes2 ACIS-I M33 Field 6 ACIS-I Nov 2 beta Cep HRC-S/LETG M33 Field 6 ACIS-I beta Cep HRC-S/LETG Nov 3 Radiation Belts SDSS J1630+4012 ACIS-S Nov 4 Bootes2 ACIS-I Bootes2 (4 obs) ACIS-I M33 Field 6 ACIS-I Nov 5 G20.0-0.2 ACIS-I M33 Field 6 ACIS-I Radiation Belts Nov 6 RX J0420.0-5022 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.